Track snags by location and trade through to sign-off, with open and overdue counts so handover does not stall on a forgotten item.
Free, no signup. Edit it here, then take it with you as CSV.
| Item | Location | Trade | Priority | Status | |
|---|---|---|---|---|---|
Fixed and verified are different states on purpose. An item the trade says is done but nobody has re-inspected is the one that reopens on handover day.
Nothing but geography. Punch list is the American term, snag list the British one, and both mean the outstanding items between substantial completion and sign-off.
At the walkthrough before handover, and it should be closed before final payment is released. Starting it earlier tends to blur it into the issue log, which is a different list about problems during the work rather than defects at the end.
Because the list gets actioned by sorting it: one electrician fixing eleven sockets in one visit is cheap, the same eleven items scattered across three visits is not.
This is a snapshot. In Wisegrid the same thing stays current as the work changes, and the rollups read off it automatically. Start your 7-day free trial, no credit card required.