{"id":194,"date":"2026-11-18T06:45:39","date_gmt":"2026-11-18T06:45:39","guid":{"rendered":"https:\/\/wisegrid.co\/blog\/?p=194"},"modified":"2026-11-03T06:49:49","modified_gmt":"2026-11-03T06:49:49","slug":"how-to-inspect-construction-work-2","status":"publish","type":"post","link":"https:\/\/wisegrid.co\/blog\/how-to-inspect-construction-work-2\/","title":{"rendered":"Construction Inspection Checklist: Phase by Phase, With an Example (2026)"},"content":{"rendered":"<p><em>By <a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a>, founder of Wisegrid. Last updated November 2026.<\/em><\/p>\n<p>A <strong>construction inspection checklist<\/strong> is a list of items to check, phase by phase, before each stage of work is covered by the next: footings before concrete, framing and in-wall systems before insulation and drywall, and finishes before handover. Each item passes or fails, and every failure becomes a numbered finding with a location, a responsible trade and a photo.<\/p>\n<p>Most defects are cheap to fix on the day they are found and expensive once they are behind drywall. A checklist makes sure the right things are looked at before that happens, and a clear finding makes sure they actually get fixed. This guide covers the three kinds of inspection, a checklist for each phase, a worked example from a framing walk, how to write findings, and the mistakes that make inspections useless.<\/p>\n<blockquote>\n<p style=\"margin:0\"><strong>Key takeaways<\/strong><\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Inspect before work is covered.<\/strong> Each phase buries the one before it.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Walk with the current drawing revision<\/strong> and the approved submittals, not memory.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Record one finding per row<\/strong>, with a location someone else can find.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Track \u201cfixed\u201d and \u201cverified\u201d as separate states.<\/strong> Only verified items clear the way for the next phase.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Tie open findings to payments<\/strong>, so they are closed before the money goes out.<\/p>\n<\/blockquote>\n<nav class=\"wg-toc\" aria-label=\"Table of contents\">\n<div class=\"wg-toc-eyebrow\"><span class=\"lp-dot\" aria-hidden=\"true\"><\/span> On this page<\/div>\n<ul>\n<li><a href=\"#three-kinds\">What are the three kinds of construction inspection?<\/a><\/li>\n<li><a href=\"#checklist-by-phase\">Construction inspection checklist, phase by phase<\/a><\/li>\n<li><a href=\"#inspection-example\">Inspection checklist example: a framing walk<\/a><\/li>\n<li><a href=\"#how-to-run\">How do you run an inspection walk?<\/a><\/li>\n<li><a href=\"#writing-findings\">How do you write findings that get fixed?<\/a><\/li>\n<li><a href=\"#common-mistakes\">Common inspection mistakes<\/a><\/li>\n<li><a href=\"#from-spreadsheet-to-shared-sheet\">From clipboard to a shared inspection sheet<\/a><\/li>\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 id=\"three-kinds\">What are the three kinds of construction inspection?<\/h2>\n<p>There are three kinds of construction inspection, and they do different jobs. A checklist like the one in this guide is for the third kind, your own quality walks, but it should prepare you for the other two.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap\">Kind<\/th>\n<th style=\"white-space:nowrap\">Who\u00a0does\u00a0it<\/th>\n<th style=\"white-space:nowrap\">What\u00a0it\u00a0checks<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Code\u00a0inspection<\/strong><\/td>\n<td>Local building department<\/td>\n<td>The legal minimum in the building code<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Special\u00a0inspection<\/strong><\/td>\n<td>Approved specialist inspector<\/td>\n<td>Higher-risk work, such as concrete or steel<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Quality\u00a0walk<\/strong><\/td>\n<td>Your superintendent or owner<\/td>\n<td>The drawings, specifications and finish<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p>On homes, the International Residential Code lists the code inspections most building departments require: foundation, plumbing, mechanical, gas and electrical systems before they are covered, frame and masonry, and a final inspection before anyone moves in. On commercial buildings, Chapter 17 of the International Building Code adds special inspections for work such as concrete, soils, steel and some wood construction. Each city or county adopts its own edition and changes, so check your permit for the exact list.<\/p>\n<h2 id=\"checklist-by-phase\">Construction inspection checklist, phase by phase<\/h2>\n<p>The rule is simple: check each phase before the next one covers it. The table lists the main phases of a building, what covers each one, and the core checks before that happens.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap\">Phase<\/th>\n<th style=\"white-space:nowrap\">Covered\u00a0by<\/th>\n<th style=\"white-space:nowrap\">What\u00a0to\u00a0check<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Layout\u00a0and\u00a0excavation<\/strong><\/td>\n<td>Footings<\/td>\n<td>Lines, levels, setbacks, soil<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Foundations<\/strong><\/td>\n<td>Concrete<\/td>\n<td>Rebar size, spacing, cover, anchor bolts<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Framing<\/strong><\/td>\n<td>Insulation, drywall<\/td>\n<td>Sizes, nailing, hold-downs, blocking<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>In-wall\u00a0systems<\/strong><\/td>\n<td>Insulation, drywall<\/td>\n<td>Pipes, ducts and wiring: placed, tested<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Insulation\u00a0and\u00a0envelope<\/strong><\/td>\n<td>Drywall, siding<\/td>\n<td>Depth, vapor barrier, flashing, sealing<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Finishes<\/strong><\/td>\n<td>Handover<\/td>\n<td>Surfaces, alignment, damage, cleaning<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Closeout<\/strong><\/td>\n<td>Owner move-in<\/td>\n<td>Systems working, manuals, punch list<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p>Within each phase, a few checks catch most problems:<\/p>\n<ul>\n<li><strong>Foundations:<\/strong> rebar matches the drawing in size and spacing, and has the specified <strong>cover<\/strong> (the depth of concrete between the steel and the surface). Anchor bolts are in the right place before the pour, not drilled in later.<\/li>\n<li><strong>Framing:<\/strong> beams and headers match the drawing, including engineered lumber where it is specified. <strong>Hold-downs<\/strong>, the metal connectors that tie walls to the foundation, are installed and fastened. <strong>Fire blocking<\/strong>, the solid pieces that stop fire spreading inside walls, is in place.<\/li>\n<li><strong>In-wall systems:<\/strong> pipes are supported and pressure tested, drains slope the right way, ducts are not crushed, and electrical boxes match the drawings. Photograph every open wall before it is closed.<\/li>\n<li><strong>Insulation and envelope:<\/strong> insulation depth matches the specification, and window and door flashing is lapped so water runs out, not in.<\/li>\n<li><strong>Finishes:<\/strong> check surfaces in raking light (a work light held along the wall), which shows bumps and joints that look fine head-on.<\/li>\n<\/ul>\n<h2 id=\"inspection-example\">Inspection checklist example: a framing walk<\/h2>\n<p>A two-story office before insulation. The superintendent checked 40 items on both floors: 34 passed and 6 failed. Each failure became a finding. <strong>Bold<\/strong> rows are not yet verified, so the walls they are in cannot be closed.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">No.<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Location<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Finding<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Trade<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>1<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Level\u00a02,\u00a0Room\u00a0204<\/strong><\/td>\n<td style=\"padding:11px 14px;font-size:14px\"><strong>Hold-down missing at wall end<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Framing<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Open<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>2<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Level\u00a02,\u00a0Room\u00a0206<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Header\u00a0smaller\u00a0than\u00a0drawing<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Framing<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Fixed<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>3<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Level\u00a01,\u00a0corridor<\/td>\n<td style=\"padding:11px 14px;font-size:14px\">Pipe not strapped at 2 points<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Plumbing<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Verified<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>4<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Level\u00a01,\u00a0Room\u00a0108<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Outlet\u00a0box\u00a0missing<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Electrical<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Verified<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>5<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Level\u00a02,\u00a0stair<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Fire\u00a0blocking\u00a0missing<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Framing<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Fixed<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>6<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Level\u00a01,\u00a0Room\u00a0112<\/td>\n<td style=\"padding:11px 14px;font-size:14px\">Duct crushed at top plate<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Heating\u00a0and\u00a0air<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Verified<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p><strong>What this tells you:<\/strong> the first-time pass rate was 85% (34 of 40). All three Level 1 findings are verified, so insulation and drywall can start on Level 1 today. Level 2 has to wait: one finding is still open and two are marked fixed by the framer but not yet re-checked. If the drywall crew is booked for Level 2 on Monday, the superintendent needs to re-check rooms 204 and 206 and the stair before then. Log the walk in that day\u2019s <a href=\"\/blog\/construction-daily-report\/\">construction daily report<\/a>.<\/p>\n<h2 id=\"how-to-run\">How do you run an inspection walk?<\/h2>\n<p>You run an inspection walk by preparing for 15 minutes, walking with the trade foreman, and recording every finding before you leave the area. The steps:<\/p>\n<ol>\n<li><strong>Bring the current drawings.<\/strong> Check the revision date first. Our guide to <a href=\"\/blog\/what-is-a-construction-site-blueprint\/\">reading construction blueprints<\/a> covers how revisions are marked.<\/li>\n<li><strong>Pull the specification sections and approved submittals<\/strong> for the work you are checking. The <a href=\"\/blog\/construction-submittal-log\/\">submittal log<\/a> shows which products were approved.<\/li>\n<li><strong>Carry forward open findings<\/strong> from the last walk, and check them first.<\/li>\n<li><strong>Check what is about to be covered.<\/strong> Look at the next two weeks of the schedule and walk those areas first.<\/li>\n<li><strong>Walk with the foreman of the trade<\/strong>, so findings are agreed on the spot instead of argued about later.<\/li>\n<li><strong>Record one finding per row<\/strong>, with location, trade, a wide photo and a close photo, and a due date.<\/li>\n<li><strong>Re-inspect and verify.<\/strong> The trade marks an item fixed; the superintendent marks it verified after checking it. Only then can the area be covered.<\/li>\n<\/ol>\n<p>If a finding comes from a conflict in the drawings rather than a mistake on site, send a <a href=\"\/blog\/rfi-in-construction\/\">request for information (RFI)<\/a> instead of guessing. If fixing it adds cost, it may need a <a href=\"\/blog\/stop-eating-change-orders\/\">change order<\/a>.<\/p>\n<h2 id=\"writing-findings\">How do you write findings that get fixed?<\/h2>\n<p>A finding gets fixed when the person reading it can find the spot, understand the problem and knows it is theirs. Write each one to that standard:<\/p>\n<ul>\n<li><strong>Location someone else can find:<\/strong> \u201cLevel 2, Room 204, north wall, 3 feet from the door,\u201d not \u201cupstairs.\u201d<\/li>\n<li><strong>The problem, compared with the drawing:<\/strong> \u201cHeader is a doubled 2\u00d78; drawing shows a doubled 2\u00d710,\u201d not \u201cheader wrong.\u201d<\/li>\n<li><strong>One trade per finding.<\/strong> If two trades are involved, split it into two rows.<\/li>\n<li><strong>Wide and close photos<\/strong>, so the trade sees both where it is and what it is.<\/li>\n<li><strong>Three severity levels at most:<\/strong> stops the next phase, fix before handover, cosmetic.<\/li>\n<li><strong>Dates on everything:<\/strong> found, due, fixed, verified.<\/li>\n<\/ul>\n<h2 id=\"common-mistakes\">Common inspection mistakes<\/h2>\n<ul>\n<li><strong>Walking with old drawings.<\/strong> You pass work that matches a revision nobody is building to anymore.<\/li>\n<li><strong>Skipping the walk before drywall.<\/strong> It is the last cheap chance to see framing and in-wall systems.<\/li>\n<li><strong>Findings with no photo.<\/strong> They get disputed, and nobody can prove what was there.<\/li>\n<li><strong>Treating \u201cfixed\u201d as done.<\/strong> Until someone checks, it is only a claim.<\/li>\n<li><strong>Letting old findings expire.<\/strong> Items from three walks ago quietly become part of the finished building.<\/li>\n<li><strong>Saving everything for the punch list.<\/strong> Our <a href=\"\/blog\/construction-punch-list\/\">construction punch list guide<\/a> explains why the final list should be short.<\/li>\n<li><strong>Paying for work that has open findings.<\/strong> Hold the line item on your <a href=\"\/blog\/schedule-of-values\/\">schedule of values<\/a>, or use <a href=\"\/blog\/retainage-in-construction\/\">retainage<\/a>, until it is verified.<\/li>\n<\/ul>\n<h2 id=\"from-spreadsheet-to-shared-sheet\">From clipboard to a shared inspection sheet<\/h2>\n<p>Most inspections start on a clipboard or in a phone\u2019s notes app, then get typed into a spreadsheet back at the office. The gap between the walk and the typing is where findings get lost, and a spreadsheet emailed to five trades soon becomes five different versions.<\/p>\n<p>In Wisegrid, findings go straight into one shared sheet per job, with the columns from the example above. Trades get free view-only access, so they see their own open items, and a status change from Fixed to Verified is visible to everyone at once. Open findings by area can feed the <a href=\"\/templates\/construction-project-dashboard\/\">construction project dashboard<\/a>, and items that need extra money move to the <a href=\"\/templates\/change-order-log-template\/\">change order log template<\/a>. At the end of the job, the free <a href=\"\/free-tools\/punch-list-builder\/\">punch list builder<\/a> turns what is left into a clean list. For the full set of job sheets, see our <a href=\"\/blog\/construction-project-management-templates\/\">construction project management templates<\/a>.<\/p>\n<h2 id=\"faq\">FAQ<\/h2>\n<h3 id=\"what-is-the-correct-order-to-inspect-construction-work\">What is the correct order to inspect construction work?<\/h3>\n<p>Inspect in the order the building is covered up: layout and excavation, foundations before concrete, framing and in-wall systems before insulation, insulation and envelope before drywall and siding, then finishes before handover. Code inspections follow a similar order, so plan your own walks a few days before each one.<\/p>\n<h3 id=\"what-should-a-construction-inspection-checklist-include\">What should a construction inspection checklist include?<\/h3>\n<p>For each phase, list what must be checked before it is covered, based on the drawings and specifications. For each finding, record a number, location, description, trade, photos, due date and status. Keep \u201cfixed\u201d and \u201cverified\u201d as separate statuses, and carry open findings forward to the next walk.<\/p>\n<h3 id=\"what-is-the-difference-between-a-code-inspection-and-a-quality-inspection\">What is the difference between a code inspection and a quality inspection?<\/h3>\n<p>A code inspection is done by the local building department and checks that the work meets the legal minimum in the building code. A quality inspection is your own, or the owner\u2019s, check that the work matches the drawings, specifications and expected finish. Passing a code inspection does not mean the work matches the contract.<\/p>\n<h3 id=\"how-do-you-document-construction-defects\">How do you document construction defects?<\/h3>\n<p>Record each defect as its own row with a precise location, a description compared with the drawing, the responsible trade, a wide photo and a close photo, and the date found. Add the date fixed and the date verified when they happen. A clear record protects you in payment discussions and disputes.<\/p>\n<h3 id=\"when-should-the-punch-list-be-created\">When should the punch list be created?<\/h3>\n<p>Start it when an area is close to finished, usually after painting, and walk it with the owner or architect before handover. If inspections at earlier phases were done well, the punch list should be short and mostly cosmetic. Close it out before final payment and the release of retainage.<\/p>\n<h2 id=\"sources\">Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/codes.iccsafe.org\/content\/IRC2021V3.0\/chapter-1-scope-and-administration\" target=\"_blank\" rel=\"noopener\">International Code Council: 2021 International Residential Code, Chapter 1 (Section R109, Inspections)<\/a><\/li>\n<li><a href=\"https:\/\/codes.iccsafe.org\/content\/IBC2021P2\/chapter-17-special-inspections-and-tests\" target=\"_blank\" rel=\"noopener\">International Code Council: 2021 International Building Code, Chapter 17, Special Inspections and Tests<\/a><\/li>\n<\/ul>\n<hr>\n<h3 id=\"keep-every-finding-where-the-whole-job-can-see-it\">Keep every finding where the whole job can see it<\/h3>\n<p>Log findings, change orders and job status in one Wisegrid workspace, and give trades free view-only access. Start with the <a href=\"\/free-tools\/punch-list-builder\/\">punch list builder<\/a>, the <a href=\"\/templates\/construction-project-dashboard\/\">construction project dashboard<\/a> and the <a href=\"\/templates\/change-order-log-template\/\">change order log template<\/a>.<\/p>\n<p><strong><a href=\"\/signup\/\">Start free \u2192<\/a><\/strong> \u00b7 <a href=\"\/blog\/construction-punch-list\/\">Punch list guide \u2192<\/a> \u00b7 <a href=\"\/for\/construction\/\">Wisegrid for construction \u2192<\/a><\/p>\n<hr>\n<blockquote>\n<p><strong>About the author<\/strong> <strong><a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a><\/strong> is the founder of Wisegrid, a higher-capacity work management grid built around a 1,000,000-cell-per-sheet limit, date-triggered automations with run history, and cross-sheet reporting. He writes about the project management documents teams actually keep updated. <a href=\"\/blog\/author\/ryan-kramer\/\">More from Ryan \u2192<\/a><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>A phase-by-phase construction inspection checklist, a worked framing walk with findings, how to write findings that get fixed, and the mistakes to avoid.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[36,37],"class_list":["post-194","post","type-post","status-publish","format-standard","hentry","category-construction","tag-inspections","tag-quality-control"],"_links":{"self":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/comments?post=194"}],"version-history":[{"count":1,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/194\/revisions"}],"predecessor-version":[{"id":195,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/194\/revisions\/195"}],"wp:attachment":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/media?parent=194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/categories?post=194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/tags?post=194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}