{"id":186,"date":"2026-11-15T04:28:00","date_gmt":"2026-11-15T04:28:00","guid":{"rendered":"https:\/\/wisegrid.co\/blog\/?p=186"},"modified":"2026-11-03T04:28:53","modified_gmt":"2026-11-03T04:28:53","slug":"lien-waivers","status":"publish","type":"post","link":"https:\/\/wisegrid.co\/blog\/lien-waivers\/","title":{"rendered":"Lien Waivers: Conditional vs Unconditional, With an Example (2026)"},"content":{"rendered":"<p><em>By <a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a>, founder of Wisegrid. Last updated November 2026.<\/em><\/p>\n<p>A <strong>lien waiver<\/strong> is a signed document in which a contractor, subcontractor or supplier gives up some or all of its right to file a mechanics lien on a property, usually in exchange for a payment. A <strong>conditional<\/strong> waiver takes effect only once the payment actually arrives. An <strong>unconditional<\/strong> waiver takes effect the moment it is signed, paid or not.<\/p>\n<p>Lien waivers travel with every payment on a construction job. Owners and lenders want them before they release money; the people signing them need to protect their rights. This guide explains the four types, when to sign each one, how waivers line up with each pay application, and how to track them so no draw is held up. It is general information, not legal advice: lien laws differ from state to state.<\/p>\n<blockquote>\n<p style=\"margin:0\"><strong>Key takeaways<\/strong><\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>A lien waiver trades lien rights for payment.<\/strong> Owners and lenders collect them so they do not pay twice for the same work.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Conditional waivers protect the person being paid.<\/strong> They only take effect once the money arrives.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Unconditional waivers are final.<\/strong> Sign one only after the payment has cleared your bank.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Progress waivers cover one payment; final waivers cover the whole job,<\/strong> so read which one you are signing.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Twelve states set the wording by law.<\/strong> Everywhere else the wording is negotiable, so read every form before you sign it.<\/p>\n<\/blockquote>\n<nav class=\"wg-toc\" aria-label=\"Table of contents\">\n<div class=\"wg-toc-eyebrow\"><span class=\"lp-dot\" aria-hidden=\"true\"><\/span> On this page<\/div>\n<ul>\n<li><a href=\"#what-is-a-lien-waiver\">What is a lien waiver?<\/a><\/li>\n<li><a href=\"#four-types\">What are the four types of lien waivers?<\/a><\/li>\n<li><a href=\"#conditional-vs-unconditional\">Conditional vs unconditional: which should you sign?<\/a><\/li>\n<li><a href=\"#lien-waiver-example\">Lien waiver tracking example<\/a><\/li>\n<li><a href=\"#waivers-and-pay-applications\">How do lien waivers work with each pay application?<\/a><\/li>\n<li><a href=\"#state-forms\">Which states have their own lien waiver forms?<\/a><\/li>\n<li><a href=\"#common-mistakes\">Common lien waiver mistakes<\/a><\/li>\n<li><a href=\"#from-spreadsheet-to-shared-sheet\">From spreadsheet to a shared waiver log<\/a><\/li>\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 id=\"what-is-a-lien-waiver\">What is a lien waiver?<\/h2>\n<p>A lien waiver works like a receipt that also gives up a legal right. To see why it exists, start with the <strong>mechanics lien<\/strong>: a legal claim against a property, filed by someone who worked on it or supplied materials and was not paid. In most states, a subcontractor who is not paid can file a lien on the owner\u2019s property even if the owner already paid the general contractor in full.<\/p>\n<p>Lien waivers manage that risk. Before each payment, the owner or lender asks for waivers from the general contractor and often from the subcontractors and suppliers below it. If everyone who was paid has waived their lien rights for that amount, the owner cannot be made to pay twice. That is why waivers are usually listed as attachments to the <a href=\"\/blog\/aia-g702\/\">American Institute of Architects (AIA) G702 payment application<\/a> and why a lender releasing money under a <a href=\"\/blog\/construction-draw-schedule\/\">construction draw schedule<\/a> will not fund a draw without them.<\/p>\n<h2 id=\"four-types\">What are the four types of lien waivers?<\/h2>\n<p>There are four types of lien waivers, set by two questions: has the payment been received yet, and does the waiver cover one payment or the whole job? The table shows when each one is used.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap\">Waiver\u00a0type<\/th>\n<th style=\"white-space:nowrap\">Sign\u00a0it<\/th>\n<th style=\"white-space:nowrap\">What\u00a0it\u00a0covers<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Conditional\u00a0progress<\/strong><\/td>\n<td>With your payment request<\/td>\n<td>One payment, once received<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Unconditional\u00a0progress<\/strong><\/td>\n<td>After that payment clears<\/td>\n<td>One payment, from signing<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Conditional\u00a0final<\/strong><\/td>\n<td>With your final invoice<\/td>\n<td>The whole job, once received<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Unconditional\u00a0final<\/strong><\/td>\n<td>After final payment clears<\/td>\n<td>The whole job, from signing<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p>Progress waivers usually cover work <strong>through a stated date<\/strong> and list exceptions, such as <a href=\"\/blog\/retainage-in-construction\/\">retainage<\/a> still being held or extra work still in dispute. California\u2019s official progress forms, for example, say they do not cover every item. A final waiver closes out the job, so it should only be signed once every dollar you are owed, including retainage and approved change orders, is settled.<\/p>\n<h2 id=\"conditional-vs-unconditional\">Conditional vs unconditional: which should you sign?<\/h2>\n<p>Sign a <strong>conditional<\/strong> waiver when you have not been paid yet, and an <strong>unconditional<\/strong> waiver only once the money is in your account. A conditional waiver says, in effect, \u201cI give up my lien rights for this amount once I receive it.\u201d If the check bounces or is stopped, the waiver does not take effect and your rights remain.<\/p>\n<p>An unconditional waiver has no such protection. It says you have been paid, so if you sign it early and the payment never arrives, you may have given up your lien rights for that amount. California\u2019s Contractors State License Board makes the same distinction: a conditional final waiver there is binding only with evidence of payment, such as a cashed check, while the unconditional forms are for people who state they have already been paid.<\/p>\n<p>Owners and lenders prefer unconditional waivers, because those are certain. The usual compromise on commercial jobs is a simple exchange: with each payment request you send a <strong>conditional waiver for this payment<\/strong> and an <strong>unconditional waiver for the last one<\/strong>, which has now cleared.<\/p>\n<h2 id=\"lien-waiver-example\">Lien waiver tracking example<\/h2>\n<p>Here is the $480,000 office fit-out from our <a href=\"\/blog\/schedule-of-values\/\">schedule of values example<\/a>, at payment application number 4. The general contractor is asking for $50,895. The lender will release it only when every subcontractor and supplier paid from this draw has sent a conditional waiver for it and an unconditional waiver for the previous payment. <strong>Bold<\/strong> rows are missing a waiver.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Sub\u00a0or\u00a0supplier<\/th>\n<th style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">This\u00a0draw<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Conditional<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Last\u00a0unconditional<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Drywall\u00a0subcontractor<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$18,000<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Received<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Received<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Ready<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Electrical\u00a0subcontractor<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$9,450<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Received<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Missing<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Hold<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Plumbing\u00a0subcontractor<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$6,300<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Received<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Received<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Ready<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Door\u00a0supplier<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$11,700<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Missing<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Received<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Hold<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Total<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>$45,450<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>2\u00a0on\u00a0hold<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p><strong>What this tells you:<\/strong> <strong>$21,150 of this draw<\/strong> ($9,450 + $11,700) is waiting on two pieces of paper. The electrician was paid on application 3 but has not sent the unconditional waiver for it, so the lender cannot confirm that money reached them. The door supplier has not sent anything for this draw yet. The other $5,445 of the $50,895 covers the general contractor\u2019s own work and fee, which needs the general contractor\u2019s own conditional waiver.<\/p>\n<h3 id=\"columns-for-a-lien-waiver-log\">Columns for a lien waiver log<\/h3>\n<p>Wisegrid does not have a lien waiver template page, but the log is simple to build in any spreadsheet. One row per waiver, with these columns:<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap\">Column<\/th>\n<th style=\"white-space:nowrap\">Example<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Payment\u00a0application<\/strong><\/td>\n<td>No. 4<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Sub\u00a0or\u00a0supplier<\/strong><\/td>\n<td>Electrical subcontractor<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Waiver\u00a0type<\/strong><\/td>\n<td>Conditional progress<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Amount<\/strong><\/td>\n<td>$9,450<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Through\u00a0date<\/strong><\/td>\n<td>Oct 31<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Date\u00a0received<\/strong><\/td>\n<td>Nov 3<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Signed\u00a0copy<\/strong><\/td>\n<td>Link to the PDF<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Status<\/strong><\/td>\n<td>Received, Missing or Rejected<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<h2 id=\"waivers-and-pay-applications\">How do lien waivers work with each pay application?<\/h2>\n<p>Lien waivers follow the same monthly rhythm as billing:<\/p>\n<ol>\n<li><strong>Agree the forms at the start.<\/strong> Find out whether your state has a required form. If it does not, agree a form in the contract and subcontracts, and get the owner\u2019s or lender\u2019s list of required waivers in writing.<\/li>\n<li><strong>Collect conditional waivers before you bill.<\/strong> Each subcontractor and supplier sends one for the amount on this pay application, with a through date that matches the billing period on your <a href=\"\/blog\/schedule-of-values\/\">schedule of values<\/a>.<\/li>\n<li><strong>Send them with your payment request,<\/strong> together with your own conditional waiver and the unconditional waivers for the previous payment.<\/li>\n<li><strong>Pay subcontractors and suppliers<\/strong> as soon as the owner pays you, within the time your subcontracts and state prompt payment rules require.<\/li>\n<li><strong>Collect unconditional waivers once each payment clears.<\/strong> Check that the amount matches what was actually paid, not what was billed.<\/li>\n<li><strong>Log every waiver in one place<\/strong>, with a link to the signed copy, so you can answer the lender in minutes instead of searching email.<\/li>\n<li><strong>Switch to final waivers at the end.<\/strong> Conditional final waivers go with the final invoice; unconditional final waivers follow once the final payment and released retainage have cleared. Most owners tie this to finishing the <a href=\"\/blog\/construction-punch-list\/\">construction punch list<\/a>.<\/li>\n<\/ol>\n<h2 id=\"state-forms\">Which states have their own lien waiver forms?<\/h2>\n<p>Twelve states set the wording of lien waivers by law, according to Levelset\u2019s state-by-state list, last updated in January 2026: <strong>Arizona, California, Florida, Georgia, Massachusetts, Michigan, Mississippi, Missouri, Nevada, Texas, Utah and Wyoming<\/strong>. In most of these states, a waiver that does not follow the required form may not be valid. Florida is a partial exception: using its form is optional, but no one can require you to sign a different one.<\/p>\n<p>In the other states, the wording is up to the parties. So a form can be drafted to waive more than one payment\u2019s worth of rights. Read the amount, the through date and the exceptions on every waiver. State rules change, so confirm the current rules for your state, and ask a construction lawyer when you are unsure.<\/p>\n<h2 id=\"common-mistakes\">Common lien waiver mistakes<\/h2>\n<ul>\n<li><strong>Signing an unconditional waiver before the money clears.<\/strong> If the payment never arrives, you may have lost your lien rights for that amount.<\/li>\n<li><strong>Amounts that do not match the payment.<\/strong> A waiver for more than you were paid gives up rights to money you never received.<\/li>\n<li><strong>Through dates that run ahead of the work.<\/strong> A waiver dated to the end of the month, signed on the 10th, can cover three weeks of unpaid work.<\/li>\n<li><strong>Missing the lower tiers.<\/strong> A supplier to your subcontractor can often file a lien too. Ask subcontractors for their suppliers\u2019 waivers on large orders.<\/li>\n<li><strong>Signing a final waiver while retainage is still held.<\/strong> Read our <a href=\"\/blog\/retainage-in-construction\/\">retainage guide<\/a> for how release usually works.<\/li>\n<li><strong>Forgetting change orders.<\/strong> Approved extras need to be paid, or listed as an exception, before a final waiver. Our <a href=\"\/blog\/stop-eating-change-orders\/\">change order guide<\/a> covers getting them signed in time.<\/li>\n<\/ul>\n<h2 id=\"from-spreadsheet-to-shared-sheet\">From spreadsheet to a shared waiver log<\/h2>\n<p>A spreadsheet log works for one or two jobs. Trouble begins when it lives on one project manager\u2019s laptop and the lender asks on Friday afternoon which waivers are still missing. Emailed copies drift apart, as we describe in <a href=\"\/blog\/collaborative-spreadsheet-edits-disappear\/\">why spreadsheet edits disappear<\/a>.<\/p>\n<p>In Wisegrid, the waiver log is one shared sheet per job, with the columns above. The office marks a waiver received and adds a link to the signed copy, and a date-triggered automation can flag any payment made more than 10 days ago with no unconditional waiver. The owner and lender can view the sheet for free, so they check status instead of emailing you. It sits next to the job\u2019s <a href=\"\/templates\/construction-draw-schedule-template\/\">draw schedule template<\/a> and <a href=\"\/blog\/construction-job-costing\/\">construction job costing<\/a> sheet, and open waivers can show up on the <a href=\"\/templates\/construction-project-dashboard\/\">construction project dashboard<\/a>. It is still a spreadsheet, so the same approach works for your <a href=\"\/blog\/construction-submittal-log\/\">submittal log<\/a> and <a href=\"\/blog\/rfi-in-construction\/\">request for information (RFI) log<\/a>.<\/p>\n<h2 id=\"faq\">FAQ<\/h2>\n<h3 id=\"what-is-the-difference-between-a-lien-waiver-and-a-lien-release\">What is the difference between a lien waiver and a lien release?<\/h3>\n<p>The two terms are often used for the same document, and California\u2019s forms are called \u201cwaiver and release.\u201d Strictly, a waiver gives up the right to file a lien, while a release can also mean clearing a lien that has already been filed. Check which one your contract or lender is asking for.<\/p>\n<h3 id=\"can-you-take-back-an-unconditional-lien-waiver\">Can you take back an unconditional lien waiver?<\/h3>\n<p>In most cases, no. Once an unconditional waiver is signed and delivered, it usually takes effect even if the payment later fails. You may still be owed the money under your contract, but you have likely lost your lien rights for that amount.<\/p>\n<h3 id=\"do-lien-waivers-need-to-be-notarized\">Do lien waivers need to be notarized?<\/h3>\n<p>It depends on your state and on what the owner or lender asks for. Some contracts and lenders require notarized waivers, and others accept a plain signature or an electronic one. Check your state\u2019s rules and your contract before the first payment application, so the first draw is not held up.<\/p>\n<h3 id=\"who-collects-lien-waivers-on-a-construction-job\">Who collects lien waivers on a construction job?<\/h3>\n<p>The general contractor collects waivers from its subcontractors and suppliers and sends them, with its own waiver, to the owner or lender. Subcontractors collect waivers from their own suppliers. On larger jobs, a lender or title company often manages the process and decides which waivers are needed before each draw.<\/p>\n<h3 id=\"does-a-lien-waiver-give-up-my-right-to-be-paid\">Does a lien waiver give up my right to be paid?<\/h3>\n<p>A lien waiver gives up your lien rights, and on many forms your payment bond rights, for the amount it covers. It does not usually cancel your contract, so the debt itself can remain. But it removes one of your strongest ways to collect, so only sign for amounts you have received or are about to receive.<\/p>\n<h2 id=\"sources\">Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/cslb.ca.gov\/consumers\/legal_issues_for_consumers\/Mechanics_Lien\/Conditional_And_Unconditional_Waiver_Release_Form.aspx\" target=\"_blank\" rel=\"noopener\">California Contractors State License Board: Conditional and Unconditional Waiver and Release Forms<\/a><\/li>\n<li><a href=\"https:\/\/www.cslb.ca.gov\/Resources\/MechanicsLien\/ConditionalWaiverAndReleaseOnProgressPayment.pdf\" target=\"_blank\" rel=\"noopener\">California Contractors State License Board: Conditional Waiver and Release on Progress Payment (form)<\/a><\/li>\n<li><a href=\"https:\/\/www.levelset.com\/blog\/lien-waivers-12-states-with-required-forms\/\" target=\"_blank\" rel=\"noopener\">Levelset: 12 states have mandatory lien waiver forms (updated January 2026)<\/a><\/li>\n<\/ul>\n<hr>\n<h3 id=\"keep-every-waiver-next-to-the-draw-it-unlocks\">Keep every waiver next to the draw it unlocks<\/h3>\n<p>Track waivers, draws and job costs in one Wisegrid workspace, and share it with the owner and lender for free. Start with the <a href=\"\/templates\/construction-draw-schedule-template\/\">draw schedule template<\/a>, the <a href=\"\/templates\/construction-job-costing-template\/\">job costing template<\/a> and the <a href=\"\/templates\/construction-project-dashboard\/\">construction project dashboard<\/a>.<\/p>\n<p><strong><a href=\"\/signup\/\">Start free \u2192<\/a><\/strong> \u00b7 <a href=\"\/blog\/aia-g702\/\">AIA G702 guide \u2192<\/a> \u00b7 <a href=\"\/blog\/retainage-in-construction\/\">Retainage guide \u2192<\/a><\/p>\n<hr>\n<blockquote>\n<p><strong>About the author<\/strong> <strong><a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a><\/strong> is the founder of Wisegrid, a higher-capacity work management grid built around a 1,000,000-cell-per-sheet limit, date-triggered automations with run history, and cross-sheet reporting. He writes about the project management documents teams actually keep updated. <a href=\"\/blog\/author\/ryan-kramer\/\">More from Ryan \u2192<\/a><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>What a lien waiver is, the four types, when to sign a conditional or an unconditional waiver, a worked tracking example, and the mistakes that cost money.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[12,33],"class_list":["post-186","post","type-post","status-publish","format-standard","hentry","category-construction","tag-construction-billing","tag-lien-waivers"],"_links":{"self":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/comments?post=186"}],"version-history":[{"count":1,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/186\/revisions"}],"predecessor-version":[{"id":187,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/186\/revisions\/187"}],"wp:attachment":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/media?parent=186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/categories?post=186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/tags?post=186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}