{"id":172,"date":"2026-11-10T09:37:48","date_gmt":"2026-11-10T09:37:48","guid":{"rendered":"https:\/\/wisegrid.co\/blog\/?p=172"},"modified":"2026-11-01T09:38:20","modified_gmt":"2026-11-01T09:38:20","slug":"construction-draw-schedule-2","status":"publish","type":"post","link":"https:\/\/wisegrid.co\/blog\/construction-draw-schedule-2\/","title":{"rendered":"Construction Draw Schedule: Example, Template and How Draws Work (2026)"},"content":{"rendered":"<p><em>By <a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a>, founder of Wisegrid. Last updated November 2026.<\/em><\/p>\n<p>A construction draw schedule is a plan that splits a project\u2019s price into payments, called draws, each released when a stage of work is done. It lists every draw, the milestone that triggers it and the amount. Contractors use it to bill homeowners, and lenders use it to release construction loan money as the building goes up.<\/p>\n<p>A clear draw schedule keeps cash coming in at the same pace it goes out. A vague one leads to arguments about whether a stage is \u201cdone,\u201d and draws that are paid weeks late or never invoiced at all. This guide shows a worked example, the rules for setting milestones, how construction loan draws work, and how to track every draw until it is paid.<\/p>\n<blockquote>\n<p style=\"margin:0\"><strong>Key takeaways<\/strong><\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Tie each draw to a milestone anyone can check<\/strong>, such as a passed inspection, not to a date or a feeling.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Draw amounts should follow the cost of the work<\/strong>, so the job never runs far ahead of what has been paid.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Deposits are limited in some states.<\/strong> California caps home improvement deposits at $1,000 or 10%, whichever is less.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Construction loan draws add steps:<\/strong> a draw request, a lender inspection, lien waivers and often a title check.<\/p>\n<p style=\"margin:0.55em 0 0\">\u2013 <strong>Track status on every draw<\/strong>: upcoming, invoiced or paid. An invoiced draw with no payment is the one to chase.<\/p>\n<\/blockquote>\n<nav class=\"wg-toc\" aria-label=\"Table of contents\">\n<div class=\"wg-toc-eyebrow\"><span class=\"lp-dot\" aria-hidden=\"true\"><\/span> On this page<\/div>\n<ul>\n<li><a href=\"#what-is-a-draw-schedule\">What is a construction draw schedule?<\/a><\/li>\n<li><a href=\"#draw-schedule-example\">Construction draw schedule example<\/a><\/li>\n<li><a href=\"#how-to-set-milestones\">How do you set draw milestones?<\/a><\/li>\n<li><a href=\"#construction-loan-draws\">How do construction loan draws work?<\/a><\/li>\n<li><a href=\"#common-mistakes\">Common draw schedule mistakes<\/a><\/li>\n<li><a href=\"#from-spreadsheet-to-shared-schedule\">From spreadsheet to a shared draw schedule<\/a><\/li>\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 id=\"what-is-a-draw-schedule\">What is a construction draw schedule?<\/h2>\n<p>A draw schedule is the payment plan for a construction contract or loan. Instead of paying everything at the end, the owner or lender pays in stages. Each stage, or draw, is tied to work that can be seen and checked, such as a poured foundation or a passed framing inspection.<\/p>\n<p>Draw schedules are most common on homes, additions and remodels, and on any project paid for with a construction loan. Larger commercial jobs usually bill monthly by percent complete against a <a href=\"\/blog\/schedule-of-values\/\">schedule of values<\/a> instead. Some lenders ask for both.<\/p>\n<h2 id=\"draw-schedule-example\">Construction draw schedule example<\/h2>\n<p>A $186,000 home addition with six draws. Each milestone is one the homeowner, the inspector and the contractor can all see. The bold row is the draw that has been invoiced but not paid.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Draw<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Milestone<\/th>\n<th style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">Share<\/th>\n<th style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">Amount<\/th>\n<th style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Deposit<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Contract\u00a0signed<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">10%<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$18,600<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Paid<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Draw\u00a01<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Foundation\u00a0inspection\u00a0passed<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">15%<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$27,900<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Paid<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Draw\u00a02<\/strong><\/td>\n<td style=\"padding:11px 14px;font-size:14px\"><strong>Framed and roof dried in<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>25%<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>$46,500<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Invoiced<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Draw\u00a03<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Rough-in\u00a0inspections\u00a0passed<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">20%<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$37,200<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Upcoming<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Draw\u00a04<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Drywall,\u00a0trim\u00a0and\u00a0cabinets<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">20%<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$37,200<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Upcoming<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Final<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Punch\u00a0list\u00a0signed\u00a0off<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">10%<\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\">$18,600<\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\">Upcoming<\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>Total<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>100%<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap;padding:11px 14px;font-size:14px\"><strong>$186,000<\/strong><\/td>\n<td style=\"white-space:nowrap;padding:11px 14px;font-size:14px\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p><strong>Check your state before copying the deposit.<\/strong> A 10% deposit like the one above is common in many places, but in California the deposit on a home improvement contract may not exceed $1,000 or 10% of the price, whichever is less. California also bars billing for work not yet done or materials not yet delivered. Other states have their own rules, so ask your licensing board or a construction lawyer.<\/p>\n<h3 id=\"why-the-timing-of-each-draw-matters\">Why the timing of each draw matters<\/h3>\n<p>The draws should keep pace with what the job costs. Here is the same addition, comparing what the contractor has spent on labor, materials and subcontractors with what has been paid.<\/p>\n<div class=\"wg-table-wrap\">\n<div class=\"wg-table-wrap\"><table>\n<thead>\n<tr>\n<th style=\"white-space:nowrap\">Point\u00a0in\u00a0the\u00a0job<\/th>\n<th style=\"text-align:right;white-space:nowrap\">Spent\u00a0to\u00a0date<\/th>\n<th style=\"text-align:right;white-space:nowrap\">Paid\u00a0to\u00a0date<\/th>\n<th style=\"text-align:right;white-space:nowrap\">Cash\u00a0position<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Foundation\u00a0done<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap\">$31,000<\/td>\n<td style=\"text-align:right;white-space:nowrap\">$46,500<\/td>\n<td style=\"text-align:right;white-space:nowrap\">$15,500<\/td>\n<\/tr>\n<tr>\n<td><strong>Framing done, draw 2 unpaid<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap\">$79,000<\/td>\n<td style=\"text-align:right;white-space:nowrap\">$46,500<\/td>\n<td style=\"text-align:right;white-space:nowrap\"><strong>\u2212$32,500<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"white-space:nowrap\"><strong>Draw\u00a02\u00a0paid<\/strong><\/td>\n<td style=\"text-align:right;white-space:nowrap\">$79,000<\/td>\n<td style=\"text-align:right;white-space:nowrap\">$93,000<\/td>\n<td style=\"text-align:right;white-space:nowrap\">$14,000<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<p><strong>What this tells you:<\/strong> while draw 2 is unpaid, the contractor is carrying $32,500 of the homeowner\u2019s project. That is why the draw should be invoiced the day the milestone is reached, and why many contracts say the next stage does not start until the last draw is paid. Our <a href=\"\/blog\/construction-job-costing\/\">construction job costing guide<\/a> shows how to track the spent column.<\/p>\n<h3 id=\"watch-construction-draw-schedule-get-paid-at-every-phase-2-minutes\">Watch: Construction Draw Schedule: Get Paid at Every Phase (2 minutes)<\/h3>\n<div class=\"wg-video\" style=\"position:relative;width:100%;max-width:720px;aspect-ratio:16\/9;margin:0 0 1.4em;border-radius:12px;overflow:hidden;background:#0f172a\"><iframe src=\"https:\/\/www.youtube.com\/embed\/RPcZ89fSdp0?rel=0&amp;playsinline=1\" title=\"Construction Draw Schedule: Get Paid at Every Phase\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\" allow=\"accelerometer; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen loading=\"lazy\"><\/iframe><\/div>\n<p style=\"margin:-0.6em 0 1.4em;font-size:15px\"><a href=\"https:\/\/www.youtube.com\/watch?v=RPcZ89fSdp0\" target=\"_blank\" rel=\"noopener\">Watch \u201cConstruction Draw Schedule: Get Paid at Every Phase\u201d on YouTube \u2192<\/a><\/p>\n<h2 id=\"how-to-set-milestones\">How do you set draw milestones?<\/h2>\n<ol>\n<li><strong>Start from your estimate.<\/strong> Group the cost lines into four to seven stages. The free <a href=\"\/free-tools\/construction-estimate-builder\/\">construction estimate builder<\/a> gives you the lines to group.<\/li>\n<li><strong>Price each draw from the cost of its stage plus its share of profit.<\/strong> Do not load early draws with more than the work is worth.<\/li>\n<li><strong>Use milestones that are easy to prove.<\/strong> A passed inspection, a dried-in roof or a delivered order. Our guide on <a href=\"\/blog\/how-to-inspect-construction-work\/\">how to inspect construction work<\/a> lists what to check at each stage.<\/li>\n<li><strong>Leave a final draw tied to the punch list.<\/strong> Five to ten percent is common. The <a href=\"\/blog\/construction-punch-list\/\">construction punch list guide<\/a> covers how to close it out.<\/li>\n<li><strong>Put the schedule in the contract<\/strong>, with what happens if a draw is late.<\/li>\n<li><strong>Plan for change orders.<\/strong> Bill approved extra work as its own line or add it to the next draw. Never quietly fold it into a milestone. See our <a href=\"\/blog\/stop-eating-change-orders\/\">change order template and process guide<\/a>.<\/li>\n<\/ol>\n<h2 id=\"construction-loan-draws\">How do construction loan draws work?<\/h2>\n<p>When a bank finances the project, the loan money is not paid out all at once. The lender releases it in draws as work is completed. The steps usually look like this:<\/p>\n<ol>\n<li><strong>The contractor prepares a draw request.<\/strong> It shows the work completed, often on the lender\u2019s own form or on an American Institute of Architects (AIA) G702 payment application with its continuation sheet. Our <a href=\"\/blog\/aia-g702\/\">AIA G702 guide<\/a> explains each line.<\/li>\n<li><strong>The lender sends an inspector<\/strong> to confirm the work is in place and matches the request.<\/li>\n<li><strong>The lender collects paperwork<\/strong>, often lien waivers from the contractor and major subcontractors and suppliers, and sometimes a title update to check no new liens have been filed.<\/li>\n<li><strong>The lender releases the funds<\/strong>, sometimes holding back a percentage as retainage until the end. The <a href=\"\/blog\/retainage-in-construction\/\">retainage guide<\/a> explains how holdbacks work.<\/li>\n<li><strong>The final draw<\/strong> is released after completion, often once a certificate of occupancy and final lien releases are in hand.<\/li>\n<\/ol>\n<p>Each lender sets its own steps and timing. Ask for the lender\u2019s draw procedures before the job starts, and build their inspection time into your cash plan. A draw request sent on the 1st may not be funded until the 10th or later.<\/p>\n<h2 id=\"common-mistakes\">Common draw schedule mistakes<\/h2>\n<ul>\n<li><strong>Milestones nobody can verify.<\/strong> \u201cRough-in complete\u201d invites an argument. \u201cRough-in inspections passed\u201d does not.<\/li>\n<li><strong>Front-loaded draws.<\/strong> They may break state law on home improvement work, and lenders cut them back.<\/li>\n<li><strong>Forgetting to invoice.<\/strong> A milestone reached on a busy week is easy to miss. Small contractors often find an unbilled draw at the end of a job.<\/li>\n<li><strong>Starting the next stage with the last draw unpaid.<\/strong> Your cash, not the owner\u2019s, pays for the next stage.<\/li>\n<li><strong>Change orders folded into milestones.<\/strong> The owner cannot see what changed, and disputes follow.<\/li>\n<li><strong>No time for lender inspections.<\/strong> Plan for the days between a draw request and the money arriving.<\/li>\n<\/ul>\n<h2 id=\"from-spreadsheet-to-shared-schedule\">From spreadsheet to a shared draw schedule<\/h2>\n<p>A draw schedule fits in a spreadsheet: one row per draw with milestone, amount, status and dates. The trouble starts when the schedule lives in the office, the superintendent knows the milestone was reached, and nobody tells the person who sends invoices.<\/p>\n<p>In Wisegrid, the draw schedule sits next to the job schedule and cost sheet in one workspace. When the superintendent marks a milestone done, the office sees it on the same sheet, and a date-triggered automation can flag any draw invoiced more than 10 days ago with no payment. Every job\u2019s draws roll up to the <a href=\"\/templates\/construction-project-dashboard\/\">construction project dashboard<\/a>, and homeowners or lenders can view their job for free. Start with the <a href=\"\/templates\/construction-draw-schedule-template\/\">construction draw schedule template<\/a> and set budgets with the <a href=\"\/templates\/project-budget-template\/\">project budget template<\/a>.<\/p>\n<h2 id=\"faq\">FAQ<\/h2>\n<h3 id=\"how-many-draws-are-on-a-construction-loan\">How many draws are on a construction loan?<\/h3>\n<p>It depends on the lender and the size of the project. A home or addition often has four to seven draws tied to stages such as foundation, framing, rough-ins, drywall and completion. Ask the lender for its draw schedule before you sign the construction contract, so your milestones match.<\/p>\n<h3 id=\"what-is-the-difference-between-a-draw-schedule-and-a-schedule-of-values\">What is the difference between a draw schedule and a schedule of values?<\/h3>\n<p>A draw schedule pays fixed amounts when milestones are reached. A schedule of values lists every part of the contract and bills a percentage of each line every month. Draw schedules suit homes and smaller jobs; schedules of values are standard on commercial projects.<\/p>\n<h3 id=\"how-much-should-the-deposit-be\">How much should the deposit be?<\/h3>\n<p>Enough to cover early costs such as permits and ordering materials, within your state\u2019s rules. Some states limit deposits on home improvement contracts. California, for example, caps them at $1,000 or 10% of the contract price, whichever is less. Check your state\u2019s licensing board before you set one.<\/p>\n<h3 id=\"what-happens-if-a-draw-is-paid-late\">What happens if a draw is paid late?<\/h3>\n<p>Your contract decides. Many contracts let the contractor pause work if a draw is unpaid after a set number of days, and some states add prompt payment rules. Send the invoice the day the milestone is reached, follow up in writing, and do not start the next stage on your own money.<\/p>\n<h3 id=\"is-there-a-free-draw-schedule-template\">Is there a free draw schedule template?<\/h3>\n<p>Yes. The Wisegrid <a href=\"\/templates\/construction-draw-schedule-template\/\">construction draw schedule template<\/a> has columns for the milestone, share, amount, status and dates, with totals built in. It works in Excel, Google Sheets or Wisegrid.<\/p>\n<h2 id=\"sources\">Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.cslb.ca.gov\/Resources\/IndustryBulletins\/2022\/Industry_Bulletin_Progress_Payment_Restrictions.pdf\" target=\"_blank\" rel=\"noopener\">California Contractors State License Board: Progress payment restrictions for home improvement contracts<\/a><\/li>\n<li><a href=\"https:\/\/occ.gov\/static\/ots\/exam-handbook\/ots-exam-handbook-213q.pdf\" target=\"_blank\" rel=\"noopener\">Office of the Comptroller of the Currency: Construction lending questionnaire (inspections, lien waivers, holdbacks)<\/a><\/li>\n<\/ul>\n<hr>\n<h3 id=\"get-every-draw-invoiced-the-day-it-is-earned\">Get every draw invoiced the day it is earned<\/h3>\n<p>Track draws next to the job in one shared Wisegrid workspace. Start with the <a href=\"\/templates\/construction-draw-schedule-template\/\">construction draw schedule template<\/a>, follow costs in the <a href=\"\/templates\/construction-job-costing-template\/\">construction job costing template<\/a>, and log extra work in the <a href=\"\/templates\/change-order-log-template\/\">change order log<\/a>.<\/p>\n<p><strong><a href=\"\/signup\/\">Start free \u2192<\/a><\/strong> \u00b7 <a href=\"\/templates\/construction-draw-schedule-template\/\">Draw schedule template \u2192<\/a> \u00b7 <a href=\"\/blog\/aia-g702\/\">AIA G702 guide \u2192<\/a><\/p>\n<hr>\n<blockquote>\n<p><strong>About the author<\/strong> <strong><a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a><\/strong> is the founder of Wisegrid, a higher-capacity work management grid built around a 1,000,000-cell-per-sheet limit, date-triggered automations with run history, and cross-sheet reporting. He writes about the project management documents teams actually keep updated. <a href=\"\/blog\/author\/ryan-kramer\/\">More from Ryan \u2192<\/a><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>How a construction draw schedule works for contractors and construction loans: an example, milestone rules, deposit limits and getting each draw paid.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[24,12],"class_list":["post-172","post","type-post","status-publish","format-standard","hentry","category-construction","tag-cash-flow","tag-construction-billing"],"_links":{"self":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/comments?post=172"}],"version-history":[{"count":1,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/172\/revisions"}],"predecessor-version":[{"id":173,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/172\/revisions\/173"}],"wp:attachment":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/media?parent=172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/categories?post=172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/tags?post=172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}