{"id":160,"date":"2026-11-06T08:34:51","date_gmt":"2026-11-06T08:34:51","guid":{"rendered":"https:\/\/wisegrid.co\/blog\/?p=160"},"modified":"2026-11-01T08:36:08","modified_gmt":"2026-11-01T08:36:08","slug":"budget-vs-actual-engineering-architecture","status":"publish","type":"post","link":"https:\/\/wisegrid.co\/blog\/budget-vs-actual-engineering-architecture\/","title":{"rendered":"Project Budget vs Actual for Engineering and Architecture Firms (2026)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>By <a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a>, founder of Wisegrid. Last updated November 2026.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Project budget vs actual compares what a project was supposed to cost with what it has cost so far. For engineering and architecture firms, the budget is usually the fee for each phase, and the actual is staff hours times their rates. The comparison only means something next to percent complete. Spending 60% of the fee is fine at 60% complete and a problem at 40%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Most firms find out a project lost money when the final invoice goes out. By then nobody can fix it. This guide shows the four numbers to track every week, a worked example on a $120,000 site design project, how to work out the burn rate and forecast, and what to do when a phase runs hot.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Key takeaways<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 <strong>Budget vs actual needs four numbers, not two.<\/strong> Budget, earned (budget \u00d7 percent complete), spent and forecast.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 <strong>Compare spent with earned, not with budget.<\/strong> That is the only way to see an overrun before the phase ends.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 <strong>The burn ratio is earned \u00f7 spent.<\/strong> Below 1.00 means each dollar of work costs more than planned.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 <strong>Forecast at completion = budget \u00f7 burn ratio.<\/strong> It turns today\u2019s overrun into a final number a principal can act on.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2013 <strong>Review weekly, by phase.<\/strong> A monthly total hides the one phase that is eating the fee.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">On this page<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"#what-is-budget-vs-actual\">What does budget vs actual mean for a design firm?<\/a><\/li>\n\n\n\n<li><a href=\"#four-numbers\">Which four numbers should you track?<\/a><\/li>\n\n\n\n<li><a href=\"#budget-vs-actual-example\">Budget vs actual example<\/a><\/li>\n\n\n\n<li><a href=\"#project-burn-rate\">What is project burn rate?<\/a><\/li>\n\n\n\n<li><a href=\"#how-to-set-up\">How to set up budget vs actual tracking<\/a><\/li>\n\n\n\n<li><a href=\"#when-a-phase-runs-over\">What to do when a phase runs over<\/a><\/li>\n\n\n\n<li><a href=\"#common-mistakes\">Common budget vs actual mistakes<\/a><\/li>\n\n\n\n<li><a href=\"#from-spreadsheet-to-shared-sheet\">From spreadsheet to a shared budget sheet<\/a><\/li>\n\n\n\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">What does budget vs actual mean for a design firm?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Budget vs actual means checking each project\u2019s fee budget against the cost of the time and expenses charged to it. In a design firm, labor is most of the cost, so the actual comes mostly from timesheets. If hours are not logged against the right project and phase every week, budget vs actual cannot work. A simple <a href=\"\/templates\/timesheet-template\/\">timesheet template<\/a> with a phase column fixes that.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Firms count the actual in one of two ways. Some use <strong>billing rates<\/strong>, so the actual can be compared directly with the fee. Others use <strong>labor cost<\/strong>, meaning what the firm pays each person per hour, which shows profit more clearly. Pick one and use it on every project. The example below uses billing rates.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Which four numbers should you track?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Each of these is tracked per phase and for the whole project:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><div class=\"wg-table-wrap\"><table class=\"has-fixed-layout\"><thead><tr><th>Number<\/th><th>What\u00a0it\u00a0means<\/th><\/tr><\/thead><tbody><tr><td><strong>Budget<\/strong><\/td><td>The fee for the phase<\/td><\/tr><tr><td><strong>Earned<\/strong><\/td><td>Budget \u00d7 percent complete<\/td><\/tr><tr><td><strong>Spent<\/strong><\/td><td>Hours \u00d7 rates, plus expenses<\/td><\/tr><tr><td><strong>Forecast<\/strong><\/td><td>What the phase will cost in the end<\/td><\/tr><\/tbody><\/table><\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Earned is the number most firms skip.<\/strong> It is what the work done so far should have cost, based on the budget. The formal name is earned value. Without it, a phase that is 80% spent looks fine until someone asks how much of it is actually done.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Budget vs actual example<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A civil engineering firm is doing site design for a small commercial building on a fixed fee of $120,000. The project manager updates percent complete every Friday. Earned is budget \u00d7 percent complete. The bold row is the phase that needs attention.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><div class=\"wg-table-wrap\"><table class=\"has-fixed-layout\"><thead><tr><th>Phase<\/th><th class=\"has-text-align-right\" data-align=\"right\">Budget<\/th><th class=\"has-text-align-right\" data-align=\"right\">Complete<\/th><th class=\"has-text-align-right\" data-align=\"right\">Earned<\/th><th class=\"has-text-align-right\" data-align=\"right\">Spent<\/th><\/tr><\/thead><tbody><tr><td><strong>Survey\u00a0and\u00a0base\u00a0map<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$12,000<\/td><td class=\"has-text-align-right\" data-align=\"right\">100%<\/td><td class=\"has-text-align-right\" data-align=\"right\">$12,000<\/td><td class=\"has-text-align-right\" data-align=\"right\">$12,600<\/td><\/tr><tr><td><strong>Schematic\u00a0design<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$30,000<\/td><td class=\"has-text-align-right\" data-align=\"right\">100%<\/td><td class=\"has-text-align-right\" data-align=\"right\">$30,000<\/td><td class=\"has-text-align-right\" data-align=\"right\">$27,000<\/td><\/tr><tr><td><strong>Design\u00a0development<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$36,000<\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>60%<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$21,600<\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>$28,800<\/strong><\/td><\/tr><tr><td><strong>Construction\u00a0documents<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$32,000<\/td><td class=\"has-text-align-right\" data-align=\"right\">10%<\/td><td class=\"has-text-align-right\" data-align=\"right\">$3,200<\/td><td class=\"has-text-align-right\" data-align=\"right\">$4,800<\/td><\/tr><tr><td><strong>Permitting<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$10,000<\/td><td class=\"has-text-align-right\" data-align=\"right\">0%<\/td><td class=\"has-text-align-right\" data-align=\"right\">$0<\/td><td class=\"has-text-align-right\" data-align=\"right\">$0<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>$120,000<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>56%<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>$66,800<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>$73,200<\/strong><\/td><\/tr><\/tbody><\/table><\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What this tells you:<\/strong> the project has spent 61% of the fee ($73,200 \u00f7 $120,000) but earned only 56%. Most of the gap is design development. It is <strong>80% spent and 60% complete<\/strong>, so it is $7,200 behind ($21,600 earned \u2212 $28,800 spent). Schematic design came in $3,000 under, which hides part of the problem in the total.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">From the four numbers to a forecast<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The table below turns those totals into a forecast. The burn ratio is also called the cost performance index in earned value management.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><div class=\"wg-table-wrap\"><table class=\"has-fixed-layout\"><thead><tr><th>Project\u00a0check<\/th><th class=\"has-text-align-right\" data-align=\"right\">Amount<\/th><\/tr><\/thead><tbody><tr><td><strong>Budget<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$120,000<\/td><\/tr><tr><td><strong>Earned\u00a0to\u00a0date<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$66,800<\/td><\/tr><tr><td><strong>Spent\u00a0to\u00a0date<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">$73,200<\/td><\/tr><tr><td><strong>Variance (earned \u2212 spent)<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">\u2212$6,400<\/td><\/tr><tr><td><strong>Burn ratio (earned \u00f7 spent)<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\">0.91<\/td><\/tr><tr><td><strong>Forecast\u00a0at\u00a0completion<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>$131,500<\/strong><\/td><\/tr><tr><td><strong>Forecast\u00a0overrun<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>$11,500<\/strong><\/td><\/tr><\/tbody><\/table><\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What this tells you:<\/strong> if the rest of the project runs like the first half, it will cost about $131,500 against a $120,000 fee. The forecast is the budget divided by the burn ratio: $120,000 \u00f7 0.9126 \u2248 $131,500. That number gives the principal something concrete to act on while 44% of the work is still ahead.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is project burn rate?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Burn rate is how fast a project spends its budget, usually per week. In the example, the team spent an average of $6,100 a week over the last month. The work left is worth $53,200 of budget ($120,000 \u2212 $66,800). At a burn ratio of 0.91, it will cost about $58,300 to finish. At $6,100 a week, that is <strong>about 9.5 more weeks<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Burn rate links the budget to staffing. If the client expects the permit set in six weeks, the team must either spend faster or the date moves. That is a capacity question. Count the people in <a href=\"\/blog\/what-is-fte\/\">full-time equivalents (FTE)<\/a>, and our <a href=\"\/blog\/capacity-planning-template\/\">capacity planning guide<\/a> shows how to check whether the people are free. If the problem is too many people on overhead work, look at <a href=\"\/blog\/utilization-rate-engineering-firms\/\">utilization rate for engineering firms<\/a> and check each person with the free <a href=\"\/free-tools\/utilization-rate-calculator\/\">utilization rate calculator<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to set up budget vs actual tracking<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Split the fee into phases before work starts.<\/strong> Use the same phases as your contract and invoices. A <a href=\"\/templates\/project-budget-template\/\">project budget template<\/a> gives you the starting layout.<\/li>\n\n\n\n<li><strong>Make every timesheet entry name a project and a phase.<\/strong> No phase, no budget vs actual.<\/li>\n\n\n\n<li><strong>Pull spent to date every week<\/strong> from timesheets and expenses. Use the same rates every time.<\/li>\n\n\n\n<li><strong>Ask the project manager for percent complete per phase.<\/strong> Base it on deliverables, such as sheets drawn or calculations checked, not on hours used.<\/li>\n\n\n\n<li><strong>Calculate earned, variance, burn ratio and forecast.<\/strong> The free <a href=\"\/free-tools\/cost-variance-calculator\/\">cost variance calculator<\/a> checks a single line.<\/li>\n\n\n\n<li><strong>Flag any phase with a burn ratio below 0.90<\/strong> and discuss it in the weekly project meeting, not at month end.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">What to do when a phase runs over<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Find the cause first. Most overruns come from one of three places:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Scope grew.<\/strong> The client asked for a second layout, extra parking or another meeting. Check the agreed <a href=\"\/blog\/project-scope-statement\/\">project scope statement<\/a>. If the work is outside it, ask for additional services in writing before doing more.<\/li>\n\n\n\n<li><strong>The wrong people did the work.<\/strong> A senior engineer drafting at a senior rate burns budget fast. Rebalance with a <a href=\"\/templates\/resource-planning-template\/\">resource planning template<\/a>.<\/li>\n\n\n\n<li><strong>The budget was too thin.<\/strong> If the same phase runs over on every project, fix the next proposal, not this team.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Then tell the client early if the fee or schedule is at risk. A short weekly status note, built with the free <a href=\"\/free-tools\/status-report-generator\/\">status report generator<\/a>, makes that conversation routine instead of a surprise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Common budget vs actual mistakes<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Comparing spent with budget only.<\/strong> 61% spent sounds fine until you learn the work is 56% done.<\/li>\n\n\n\n<li><strong>Percent complete based on hours used.<\/strong> That makes earned always equal spent, so you never see a problem.<\/li>\n\n\n\n<li><strong>Timesheets coded to the project but not the phase.<\/strong> You see the total overrun but not where it started.<\/li>\n\n\n\n<li><strong>Reviewing once a month.<\/strong> On a four-month project, that is only three chances to react.<\/li>\n\n\n\n<li><strong>Doing extra work before it is approved.<\/strong> It goes straight into spent with no budget to match.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">From spreadsheet to a shared budget sheet<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A spreadsheet works well for one project. With 20 projects, it means 20 files, someone pasting timesheet exports into each one every Friday, and a summary tab that breaks when a phase is added. Project managers update percent complete in their own copies, and the principal sees last week\u2019s numbers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Wisegrid, each project is a sheet with the same phase columns. Project managers update percent complete in one place, timesheet totals land in the Spent column, and a portfolio view shows every project\u2019s burn ratio side by side. It is still a grid, so the formulas above work as written. For the monthly report to principals, the <a href=\"\/templates\/executive-project-status-report-template\/\">executive project status report template<\/a> pulls the same numbers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is a budget vs actual report?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A report that lists each project or phase with its budget, the actual cost so far and the difference. For design firms it should also show percent complete and earned value, so you can tell whether spending is ahead of the work or just on schedule.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How do you calculate project burn rate?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Divide the cost spent over a period by the number of weeks in that period. For example, $24,400 spent over four weeks is a burn rate of $6,100 a week. Divide the cost left to finish by the burn rate to see how many weeks of work remain.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is a good burn ratio?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">1.00 means the work costs exactly what was planned. Above 1.00 means it costs less. Many firms review any phase that drops below 0.95 and act on anything below 0.90. The right line depends on how much profit you built into the fee.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Should budget vs actual use billing rates or cost rates?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Either works if you are consistent. Billing rates compare directly with the fee and are easier for project managers. Cost rates, meaning what you pay each person per hour, show true profit. Many firms show project managers billing rates and give principals both.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How often should a firm review budget vs actual?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Weekly for active projects. Timesheets are usually submitted weekly, so the numbers are fresh. A monthly review is too slow to correct a phase that lasts six to eight weeks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sources<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.pmi.org\/learning\/library\/earned-value-controlling-forecasting-performance-7653\" target=\"_blank\" rel=\"noopener\">Project Management Institute: Earned value, the good, the bad and the ugly<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www2.cdc.gov\/cdcup\/library\/practices_guides\/cdc_up_earned_value_practices_guide.pdf\" target=\"_blank\" rel=\"noopener\">CDC Unified Process Practices Guide: Earned Value Management<\/a><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<h3 class=\"wp-block-heading\">See every project\u2019s burn ratio on one screen<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Track phases, hours and percent complete in one shared Wisegrid workspace. Start with the <a href=\"\/templates\/project-budget-template\/\">project budget template<\/a>, log time in the <a href=\"\/templates\/timesheet-template\/\">timesheet template<\/a>, and plan staff with the <a href=\"\/templates\/capacity-planning-template\/\">capacity planning template<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"\/signup\/\">Start free \u2192<\/a><\/strong> \u00b7 <a href=\"\/templates\/project-budget-template\/\">Project budget template \u2192<\/a> \u00b7 <a href=\"\/blog\/utilization-rate-engineering-firms\/\">Utilization rate guide \u2192<\/a><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>About the author<\/strong> <strong><a href=\"\/blog\/author\/ryan-kramer\/\">Ryan Kramer<\/a><\/strong> is the founder of Wisegrid, a higher-capacity work management grid built around a 1,000,000-cell-per-sheet limit, date-triggered automations with run history, and cross-sheet reporting. He writes about the project management documents teams actually keep updated. <a href=\"\/blog\/author\/ryan-kramer\/\">More from Ryan \u2192<\/a><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>How engineering and architecture firms track budget vs actual on fee: the 4 numbers to watch, a worked example with burn rate, and a reliable forecast.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[20,19],"class_list":["post-160","post","type-post","status-publish","format-standard","hentry","category-engineering-ae","tag-engineering-firms","tag-project-budgets"],"_links":{"self":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/comments?post=160"}],"version-history":[{"count":1,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/160\/revisions"}],"predecessor-version":[{"id":161,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/posts\/160\/revisions\/161"}],"wp:attachment":[{"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/media?parent=160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/categories?post=160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wisegrid.co\/blog\/wp-json\/wp\/v2\/tags?post=160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}